Rapid Waste Heat Boiler Retubing at IPL Mount Isa Site

In a case study in the November/December issue of Sulphur Magazine, B. Lamb of MECS, M. Donaghue and R. Gosling of RCR Energy and L. Leonforte of Incitec Pivot discuss a critical maintenance project that was constrained to a very tight turnaround, and how working with the right team of experts allowed IPL Mount Isa to accomplish their goals while at the same time setting the plant up for improved operations.  

Blasch ceramic ferrules played a key part in this turnaround, saving the plant as much as 67% in installation time.

Download this informative case study now to find out how this was accomplished.